Culture & Life Yonhap News Culture · 2026-10-26

$9.5M Ghost Marina: Why South Korea's Ambitious Island Yacht Harbor Sits Abandoned After 6 Years

Key Points
  • Geoje City spent approximately 12.8 billion won in taxpayer funds to complete basic marina facilities in 2020, but the harbor has remained completely unused for six years.
  • The project became an abandoned 'white elephant' after private partners pulled out due to low economic feasibility, poor accessibility, and a lack of supporting tourist amenities.
  • With key floating breakwaters and mooring docks now suffering structural decay, the municipality faces mounting public criticism over wasted funds and rising safety concerns.
Summary A multimillion-dollar marine tourism project on Geoje Island has turned into an abandoned "white elephant," sitting completely unused for six years after its primary infrastructure was built, local officials revealed on October 26. Back in 2007, the coastal city of Geoje in South Gyeongsang Province launched ambitious plans to develop the Geunpo Marina in Nambu-myeon to revitalize local marine leisure and tourism. Under a public-private partnership structure, the city aimed to construct the harbor and core waterfront infrastructure, after which a private developer was slated to build a four-story clubhouse, yacht maintenance facilities, and take over commercial operations. A total budget of 15.5 billion KRW (combining state, provincial, and municipal funds) was approved, and approximately 12.8 billion KRW (around $9.5 million USD) of taxpayer money was invested to build a 99-meter floating breakwater, moorings capable of docking 64 yachts, and reclaimed land measuring 9,487 square meters by April 2020. However, the marina has never welcomed a single yacht. The preferred private bidding partner lost its status over economic feasibility issues and regulatory roadblocks, and the city has failed to attract any new private operators. Geunpo Port lies on the remote southern tip of Geoje Island, suffering from poor accessibility and a distinct lack of nearby accommodations or leisure amenities needed to attract wealthy yachting enthusiasts. Without ongoing maintenance or operational activity, the unused facilities have begun to decay. The floating breakwater and mooring docks have deteriorated and sustained structural damage from harsh waves. Although Geoje City weighed the idea of temporarily constructing and running the clubhouse and repair center directly, it abandoned the plan over liability and safety risks, as the damaged breakwaters can no longer reliably shield against high surf. During administrative audits, city council members sharply criticized the project as a textbook example of wasted public funds, prompting officials to state that they are reviewing options to eventually normalize operations.
Sponsored · Ad